CURRENT PROJECTS

2935 Telegraph
3250 Hollis
401 Derby
3014 Chapman
32nd & Hannah

SAMPLE PROJECTS

3900 Adeline
Lampwork Lofts
Bakery Lofts
B2 Lofts
B3 Lofts
Telegraph Lofts
Packard Lofts
5th Street Lofts
Exchange Studios
1080 Lofts

Other Past Projects

  • slideshow1
  • slideshow2
  • slideshow3
  • slideshow4
  • slideshow5
  • slideshow6
 
       
 
3250 HOLLIS
 

CURRENT STATUS

Under construction

PROPERTY CONTACT

N/A

PROPERTY WEBSITE

N/A

3250 HOLLIS STREET, OAKLAND, CALIFORNIA

3250 Hollis Street is a to-be-built mixed-use property located on two acres on an entire city block in Oakland, California. The site is expected to have 124 residential and work/live, as well as 2,900 square feet of retail space. The residences will feature large windows and high quality modern finishes and appliances, custom countertops, premium flooring, designer lighting, and other special features. All housing units will enjoy access to outdoor space through balconies and terraces as well as beautifully landscaped common courtyards. Inherent in the plan designs is an effort to create an ecologically conscious project for the individual resident as well as for the larger environment of the neighborhood and city through the use of rooftop solar panels, sustainable renewable and recycled building materials, and low-e glass coatings.

Madison Park’s vision is to create a uniquely interactive, artful, ecologically friendly project that builds on the energy and diversity of the local community and becomes a vital component of the neighborhood. By utilizing various street front heights, the property will engage with the scale of the surrounding buildings.

The Project team is headed by Levy Design Group as the project architect, and DCI Construction as the general contractor. Levy Design Group and DCI Construction have been engaged in the two most recent Madison Park’s projects—Lampwork Lofts, which completed on time and has stabilized, and 3900 Adeline, which is currently under construction. Madison Park acquired the property in April 2015, which is currently occupied by month-to-month light industrial tenants who will continue operating until start of construction. Construction is slated to begin in fall 2016, and construction completion estimated for early 2018.

LEASING INFORMATION

For general leasing information regarding any of our properties, you can call our main office at (510) 452-2944. You can also contact the property manager (left) directly if you are looking for leasing information for a specific building.